• UAEVARTHA ENGLISH
  • UAEVARTHA
Monday, November 9, 2026
Middle East News Today | UAE, Saudi & GCC Updates
  • UAE
    • Dubai
    • Abu Dhabi
    • Sharjah
    • Ajman
    • Ras Al Khaimah
    • Fujairah
    • Umm Al Quwain
  • GCC
    • Saudi Arabia
    • Qatar
    • Kuwait
    • Bahrain
    • Oman
  • India
  • World
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • UAE
    • Dubai
    • Abu Dhabi
    • Sharjah
    • Ajman
    • Ras Al Khaimah
    • Fujairah
    • Umm Al Quwain
  • GCC
    • Saudi Arabia
    • Qatar
    • Kuwait
    • Bahrain
    • Oman
  • India
  • World
  • News
  • Tech
  • Entertainment
  • Lifestyle
Middle East News Today | UAE, Saudi & GCC Updates
  • World
  • News
  • GCC
  • UAE
  • India
  • Entertainment
  • Tech
  • Lifestyle
Home News Business

Dubai Opens Final World Trade Centre Bridge to Ease Traffic

Web Desk by Web Desk
1 week ago
in Business
Reading Time: 2 mins read
Dubai RTA opens the final bridge of the Dh696M World Trade Centre project, slashing intersection delays from 12 minutes to 90 seconds.
43
SHARES
122
VIEWS
Share on WhatsappShare on Facebook

Dh696-million project completes five-bridge network, reducing intersection delays from 12 minutes to 90 seconds

DUBAI, United Arab Emirates — Dubai’s Roads and Transport Authority opened the fifth and final bridge of the Dh696-million-plus World Trade Centre Roundabout Development Project on Friday, completing a 5km elevated corridor designed to alleviate severe bottlenecks at one of the city’s primary junctions.

The newly commissioned 1km, two-lane bridge links Al Majlis Street directly to 2nd December Street. According to transport authorities, the dedicated connection handles up to 3,000 vehicles per hour and slashes travel time between the two roads from six minutes to one minute.

Across the wider intersection—which has replaced the historic roundabout with a converted ground-level junction and elevated spans—average motorist waiting times are projected to fall from 12 minutes to 90 seconds.

The World Trade Centre interchange serves as a transit hinge between Sheikh Zayed Road and five major arteries: Sheikh Khalifa bin Zayed Street, Sheikh Rashid Street, 2nd December Street, Za’abeel Palace Street, and Al Majlis Street. It handles heavy cross-town traffic flows between the Dubai World Trade Centre, Downtown Dubai, Dubai International Financial Centre (DIFC), Deira, and nearby commercial districts.

With the final span now in service, the full Dh696-million infrastructure plan stands complete. The structural components across the five-bridge system comprise:

  • Sheikh Zayed Road to Sheikh Khalifa bin Zayed Street: A 1km, two-lane elevated link carrying up to 3,000 vehicles per hour toward Deira.
  • Sheikh Rashid Street to 2nd December Street: Two bridges providing two lanes in each direction, extending 2km in total length with a throughput capacity of 6,000 vehicles per hour.
  • Al Majlis Street to 2nd December Street: Two bridges spanning a combined 2km, including Friday’s final opening, delivering a cumulative capacity of roughly 6,000 vehicles per hour.

The phased overhaul eliminates the operational necessity for commuter traffic to weave through the former roundabout circle, directing through-traffic onto continuous flyovers and unclogging adjacent links to Al Mustaqbal Street and Sheikh Rashid Street.

Tags: DubaiInfrastructureRoadsRTATrafficTransportUAE
  • Trending
  • Comments
  • Latest
Three books by journalists Navas Methar and Shamnad Puthussery will be released at the 45th Sharjah International Book Fair by Sheikh Ali Al Mulla.

Books by Journalists to Be Released at Sharjah International Book Fair

Young participants created handmade relief prints and custom stamps at a creative children's workshop during the 45th Sharjah International Book Fair.

Children Explore Printmaking and Craft Custom Stamps at SIBF 2026

Aster DM Healthcare partners with MENASCO to build the AED 350M Medcare Royal Hills Hospital in Dubai Studio City, adding 144 beds by 2029.

Aster DM Healthcare to launch 12th hospital in UAE – Medcare Royal Hills in partnership with MENASCO

Kerala CMO will deploy a digital dashboard to track industrial projects real-time and resolve bottlenecks directly, CM V.D. Satheesan announced.

Kerala CMO to Set Up Live Dashboard for Daily Project Tracking

US President Donald Trump says Task Force Iron Gate is in full force against Iran, ahead of White House Qatar talks and expected APEC summit diplomacy.

Trump Says Task Force Iron Gate Active as Iran Blockade Tightens

Poet P.K. Gopi and lyricist B.K. Harinarayanan discuss poetry, social realities, and modern songs at the 45th Sharjah International Book Fair.

P.K. Gopi Reinterprets Classic Nursery Rhyme at Sharjah Book Fair

Kerala CMO will deploy a digital dashboard to track industrial projects real-time and resolve bottlenecks directly, CM V.D. Satheesan announced.

Kerala CMO to Set Up Live Dashboard for Daily Project Tracking

US President Donald Trump says Task Force Iron Gate is in full force against Iran, ahead of White House Qatar talks and expected APEC summit diplomacy.

Trump Says Task Force Iron Gate Active as Iran Blockade Tightens

Poet P.K. Gopi and lyricist B.K. Harinarayanan discuss poetry, social realities, and modern songs at the 45th Sharjah International Book Fair.

P.K. Gopi Reinterprets Classic Nursery Rhyme at Sharjah Book Fair

Kerala CMO will deploy a digital dashboard to track industrial projects real-time and resolve bottlenecks directly, CM V.D. Satheesan announced.
Business

Kerala CMO to Set Up Live Dashboard for Daily Project Tracking

US President Donald Trump says Task Force Iron Gate is in full force against Iran, ahead of White House Qatar talks and expected APEC summit diplomacy.
World

Trump Says Task Force Iron Gate Active as Iran Blockade Tightens

Poet P.K. Gopi and lyricist B.K. Harinarayanan discuss poetry, social realities, and modern songs at the 45th Sharjah International Book Fair.
Entertainment

P.K. Gopi Reinterprets Classic Nursery Rhyme at Sharjah Book Fair

Dubai RTA opens the six-lane Al Khaleej Street Tunnel linking Infinity Bridge to Deira, handling 12,000 vehicles per hour under the Shindagha Corridor plan.
Travel

RTA Opens 1,650-Metre Al Khaleej Street Tunnel with Three Lanes in Each Direction

Middle East News Today | UAE, Saudi & GCC Updates

© 2026 News Middle East. All Rights Reserved.

Navigate Site

  • UAEVARTHA ENGLISH
  • UAEVARTHA

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

  • World
  • News
    • Politics
    • Business
    • Science
  • GCC
  • UAE
    • Dubai
  • India
  • Entertainment
    • Gaming
    • Music
    • Movie
    • Sports
  • Tech
    • Apps
    • Gear
    • Mobile
    • Startup
  • Lifestyle
    • Food
    • Fashion
    • Health
    • Travel

© 2026 News Middle East. All Rights Reserved.